|
Central Coast Adventist School is a comprehensive, Christian, coeducational school catering for students from Pre-Kindy to Year 12.
Located in the heart of the Erina CBD on the Central Coast, we have been providing quality Christian education since 1969. |
 |
|
Caring for their tomorrow - today. |
 |
|
To acknowledge God as the source of life and wisdom.
To develop in each student a sense of self worth.
To encourage each student to achieve their academic, physical, social and spiritual potential. |
 |
|
Compassion
Excellence
Integrity
Enthusiasm
Affirmation
Trust
Respect
Hope
Discovery |
 |
|
The grounds cover 10 acres of land nestled in the heart of the Erina CBD, alongside the Erina Fair shopping complex. The school is 8 stages into a 10 stage, multi-million dollar building program that will accommodate the Kindergarten to Year 6 double streamed and Year 7-12 triple streamed school.
The Primary facilities include three separate permanent buildings housing all classes from Kindergarten - Year 6. The Primary School has a fully equipped Computer Laboratory.
The Secondary School has just recently opened new buildings which include dedicated facilities for Music, Fine Arts, Technics and Drama. These new buildings are in addition the existing buildings which house Computer Laboratories, Science Laboratories, a Food Technology kitchen with multiple stations and a number of general purpose classrooms.
There is a shared Library facility in the centre of the campus that contains not only books, but computer access, audio-visual access and tutorial areas. A gymnasium/assembly hall designed to cater for sports such as basketball, volleyball and badminton, also acts as the school assembly/performance hall. The hall was built in memory of Naomi Frew an ex-student. A large sports oval is situated toward the bottom of the site. |
 |
|
Construction on the first stage of the Sports Centre complex has commenced. This first stage of the Sport Centre will be a fully enclosed, full size, double basketball court. This will alleviate the pressure on the current hall space and allow events such as concerts and end of year programs to be held on site. Completion on this stage is due in late 2010. |
 |
|
|
|